From architectural concepts to coordinated design solutions through integrated digital workflows.
Architectural competitions and large-scale conceptual projects are often associated with creative exploration, rapid design iterations and ambitious visual presentations. At first glance, BIM may appear too structured, time-consuming or technically demanding for this stage of architectural design. Conventional modeling, sketching and visualization workflows may seem more flexible, particularly when deadlines are short and the design is constantly evolving.
However, complex architectural competitions require much more than an original idea. A successful proposal must demonstrate spatial and functional coherence, respond to numerous technical and programmatic requirements, and communicate its architectural intentions through consistent drawings, diagrams, models and visualizations.
At ICH | Integrated Construction Hub, we see BIM and complementary parametric 3D workflows as valuable instruments for achieving precisely this integration.
BIM Beyond Conventional Project Stages
Introducing BIM during conceptual or competition design does not mean developing every component to construction-level detail.
The objective is to establish an appropriate level of model development that supports architectural decisions, spatial organization, technical feasibility and communication. For large-scale projects, this can involve numerous interconnected considerations: building capacity, circulation, accessibility, structural concepts, functional relationships, building envelopes, infrastructure and the wider urban context.
Addressing these aspects within a coordinated digital environment allows them to inform the architectural concept as it evolves. Rather than treating design, technical development and presentation as consecutive activities, they can progress in parallel.
This approach is particularly valuable in fast-track design processes, where significant decisions must be made, evaluated and communicated within limited timeframes.
One Design Environment, Multiple Deliverables
Architectural competitions typically require an extensive range of presentation materials, often produced within a relatively short period.
Plans, sections, elevations, area schedules, spatial diagrams, isometric views, rendered images and physical models must all communicate the same architectural proposal. An integrated model-based approach creates a common geometric and informational reference for these different outputs.
Design modifications can be evaluated in three dimensions while their implications are considered across functional layouts, building sections, architectural relationships and presentation materials. The model also becomes a valuable basis for developing explanatory diagrams, studying complex geometry and preparing digital information for physical model production. The benefit is not simply faster documentation. It is the ability to maintain consistency between the architectural idea and the different ways in which that idea is developed, tested and presented.
A competition proposal becomes more convincing when architectural ambition is supported by a coherent and technically considered design.
Selected Projects and Studies
The following projects illustrate two different applications of integrated digital design workflows: the development of a large-scale architectural competition proposal and the technical development of a complex architectural concept.
Case Study 01 — Maksimir Stadium & Svetice Sports and Recreation Centre
International Architectural and Urban Design Competition | Zagreb, Croatia | 2026
The international competition for the new Maksimir Stadium and Svetice Sports and Recreation Centre presented a substantial architectural and urban design challenge. The project brought together a new football stadium, athletics and recreational facilities, indoor sports functions, landscape areas and connections with the wider city and Borongaj transport infrastructure.
The scale of the assignment required a design approach capable of addressing individual buildings and facilities while maintaining a coherent architectural and urban concept.
An Integrated Architectural and Urban Concept
Our proposal approached the competition area as a connected spatial system rather than a collection of independent buildings.
A continuous architectural and landscape ribbon provided the organizing principle, connecting sports facilities, pedestrian and cycling routes, public spaces and recreational areas. The proposed football stadium, accommodating approximately 35,000 spectators, required careful consideration of seating geometry, sightlines, spectator circulation, accessibility, functional zoning and the relationship between the stadium structure, envelope and architectural expression.
At the same time, the wider proposal addressed athletics facilities, supporting sports buildings, landscape integration and connections between different areas of the complex. These elements were developed as parts of an overall spatial concept, while respecting their individual functional and operational requirements.
Developing and Communicating the Proposal
The design process brought together spatial modeling, architectural development, functional analysis and visual communication.
Digital models provided the basis for studying stadium geometry, building relationships, terrain interfaces and the overall composition of the complex. Plans, sections, three-dimensional representations and explanatory diagrams supported the development and presentation of the architectural proposal.
The process also included the preparation of a physical 3D-printed competition model, translating the digital design into a tangible representation of the proposed urban and architectural composition. The resulting presentation combined technical and spatial information with architectural visualization, communicating both the broader concept and the functional organization of the individual facilities.
The Maksimir project illustrates how an integrated digital design approach can support a demanding architectural competition without separating creative exploration from technical and functional development.
Case Study 02 — Nikola Tesla Museum
Complex Roof and Building Envelope Design Development | Belgrade, Serbia | 2026
The new Nikola Tesla Museum project involves the transformation of the historic Milan Vapa Paper Mill in Belgrade into a contemporary cultural institution. The architectural concept, developed by Zaha Hadid Architects in collaboration with Bureau Cube Partners, introduces complex contemporary architectural interventions within the context of an existing industrial building. Following the international architectural competition, the project advanced into technical design development and implementation planning.
ICH's involvement focuses on the subsequent Design & Build development of the complex roof and building envelope, translating the architectural design intent into coordinated geometric, structural and construction-related solutions.
From Complex Geometry to Coordinated Design
One of the central challenges of this assignment is the development of a highly complex, free-form architectural roof, incorporating glazed and opaque envelope elements, non-standard geometries and numerous technical interfaces.
The design development process began with the reconstruction and further development of the three-dimensional architectural geometry using Rhino-based workflows. The evolving model incorporates the principal roof and envelope systems, including glazing, supporting frames, external and internal cladding, thermal envelope components and preliminary structural relationships. The coordination process involves architectural geometry, structural systems, façade engineering, material and system selection, and the relationship between the proposed roof and the existing building.
The digital model provides a common environment for identifying geometric constraints, examining interfaces, developing technical solutions and coordinating successive design iterations.
Preserving Architectural Intent Through Technical Development
Complex architectural geometry often presents challenges that cannot be fully resolved during the early conceptual stages of a project.
The transition toward detailed design requires careful examination of component geometry, structural relationships, system build-ups, tolerances and construction feasibility. In the Nikola Tesla Museum project, model-based development supports this process by bringing different technical considerations into a shared three-dimensional context. The coordinated information is progressively translated into architectural drawings, technical details, structural analyses and design documentation for review and further development. The project demonstrates the importance of maintaining a continuous relationship between architectural intent, digital geometry and the technical requirements of implementation.
It also illustrates how BIM-oriented coordination and complementary parametric modeling workflows can contribute to the development of complex architectural projects beyond the competition stage.
From Concept to Coordinated Project Delivery
The Maksimir Stadium and Nikola Tesla Museum projects represent different stages and applications of integrated digital design.
One illustrates the value of model-based development during an architectural competition, where ambitious concepts, extensive functional requirements and demanding presentation schedules must be addressed simultaneously. The other demonstrates how complex architectural geometry can be developed into coordinated technical solutions while preserving the original design intent. Both reflect our approach to architectural design: combining creative exploration, spatial understanding, technical knowledge and digital modeling within a continuous design process.
For ICH, BIM is not simply a documentation technology. It is part of a broader methodology for developing, coordinating and communicating architectural ideas.
BIM Development & Architectural Collaboration
ICH provides architectural BIM development, technical documentation and model-based coordination services, supporting both our own design assignments and collaborations with other architectural and engineering practices. Our experience across architectural design, complex building envelopes and multidisciplinary coordination allows us to contribute to projects at different stages of development.
Explore BIM Development & Architectural Collaboration at ICH.